Epicor Migration – v9 to v11 - for Leader in Industrial fan Manufacturer
Situation
Using Epicor V9
The Bill of Material and Bill of Operation differ for each finished good. The standard engineering workbench consumes more time and space for every finished good.
Production & Inventory not tracked
Issues with product Traceability
Since Production & Inventory is not tracked, Finance is handled manually & taking lot of time to complete the Month-End Activities & Year End Closing
Solution
Migrating to EPICOR V11.0 from EPICOR V9.0
Implemented the Production and Inventory module during migration
Benefits
The job's Bill of Material and Bill of Operation are created based on the quote level engineering through MRP.
Able to have proper tracking of Inventory and 100% inventory Match between Physical Inventory and System Inventory
Able to track production and the cost associated with the production
Entire Finance was Integrated and able to complete their month End Activities on time